Homa GRP Series Manuel d'utilisateur Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 13
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
GRP Series
Installation, Operation & Maintenance Manual
INSTALLATION OF PUMPS WITH RING
STANDS:
The ring stand design allows for simple,
economical installation and can be transported
from one installation to another.
For pump models without integral support feet,
install the ring stand to the underside of the volute
with the supplied fasteners. Apply a thread locking
compound to threads before installing such as Blue
Loctite #242.
Install lifting chain or cable of adequate size
and load rating of the unit. Allow for proper
length to permit proper lowering and raising of
the pump. Properly position power cables and
lifting device over the load and keep from
entering the pump suction.
Prior To Installation:
Before lowering the pump into position check the
direction of rotation. The impeller will rotate
clockwise as viewed from the top. Therefore the
pump will try to move in the counter clockwise
direction as the impeller rotates (known as start
reaction). "Bump the Motor" by closing the pump
circuit breaker and push the pump start button and
look for the direction of movement specified above.
For three phase motors, if the starting jerk is in the
clockwise direction, open the circuit breaker to
isolate power and interchange two of the three
phase leads inside the control panel.
Make sure to use lifting equipment that has
adequate capacity for the pump that will be
handled. Before installing pump, check to be
certain the profile seal is properly positioned in the
guide claw flange. Position pump so the guide ears
on the discharge flange engage the rails. Slowly
lower the pump along the guide rail. Once the
pump reaches its bottom location it will auto-
matically connect to the base.
Bolts
PUMP MODEL Anchors
SIZE TORQUE
1 ¼ -2” GRP
THREADED
4 M12mm 37 ft/ #
2” GRP
4 M16x60 108 ft/ #
FLANGED
4 M16mm 74 ft/ #
Notes:
1. Flange bolts must be tightened in cross pattern
to avoid damage to the raise face flanges.
2. Standard Flange Bolts are 316SS
3. Standard Anchors are Plated Steel
4. Autocoupling systems include qty 4 M12
anchors for the upper bracket. Torque to 38 ft#.
5.
Anchor bolt holes should be drilled to the actual
diameter of the anchor (M12 anchor requires
12mm diameter hole).
START-UP
Prior To Applying Power
Prior to applying power to the pump; double check
all wiring and verify that the power (Voltage, Phase)
that will be supplied to the unit matches the name-
plate specified values. Measure resistance of cable
and pump motor resistance of ground circuit
between control panel and outside of pump.
Perform MEG ohm check of motor insulation.
Record all data on attached start-up checklist
Minimum Submergence
For optimal cooling, motor should be completely
submerged at all times. In pump-down systems,
level should not fall below one discharge diameter
above the top of the volute. For continuous
operation with a VFD, level should not be
maintained below the top of the motor for sustained
periods. For specific inquiries, please contact
factory for assistance.
Wet Well Applications
If the above checks prove satisfactory the pump is
ready for operation. Lower the pump into position.
(Refer to Mechanical installation section of this
manual.) Open discharge valve, and verify that all
check valves operate freely. It is very common for
discharge check valves to be jammed shut (or
open) after sitting for a period of time. Once all
valves are open and free, start the pump and allow
it to stabilize for several minutes prior to recording
any test data. Listen for any unusual noise and be
on the lookout for unusual vibration. This is
generally detectable on guide rails for Auto
Coupling installations and on discharge piping for
ring stand installations. Also for Auto Coupling
installations, look for any blow by from the
discharge connection. Perform all remaining
electrical, operational, and performance tests
specified on the start-up report at the back of this
manual. Record and provide details on the
checklist to validate warranty.
Pg.5
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 11 12 13

Commentaires sur ces manuels

Pas de commentaire