GENERAL INSTRUCTIONS:
This manual is intended to provide basic
installation and start-up guidance. It is to be read
and thoroughly studied prior to attempting to install
or operate any of the equipment supplied.
Equipment damage, which occurs by not following
these instructions will void the warranty.
SAFETY PRECAUTIONS:
Only trained, qualified personnel shall be utilized
for installation and start-up.
The following is a general list of safety precautions
that should be followed when installing, starting-up
or servicing the pump.
The pump station owner or operator is
ultimately responsible for ensuring that all
equipment is installed, started up and operated
in a safe manner.
Do not work alone.
Double check to make sure that all lifting
equipment is in good working order and that it
has adequate lifting capacity for the weight that
it will handle.
Wear safety helmet, goggles and protective
shoes, or appropriate safety materials required.
Before working on the pump make sure that
the power is disconnected and cannot be
energized by others. Lockout and tag the
control panel circuit breaker.
Do not stand under suspended loads!
Never enter or work within a wet well without
first checking to make sure sufficient oxygen is
present and that there are no explosive or
poisonous gases present.
All personnel, who work with sewage pumping
equipment and systems shall be vaccinated
against diseases that can occur. If there are
any questions or doubts in this area it is
strongly suggested that the local health agency
be contacted.
For Hazardous Area Classifications, only use
pumps with suitable Explosion Proof Rating.
EQUIPMENT INVENTORY AND
INSPECTION:
Upon arrival of pump shipment carefully unpack all
components and compare with shipping and
purchase order documents to ensure that the order
is complete. Also inspect equipment for any
damage that might have occurred in shipment. If
any problems are detected contact an authorized
HOMA Pump Technology Representative
immediately.
TRANSPORTATION AND STORAGE
PROCEDURE:
Always lift the pump by its lifting bail or eye bolt.
Never lift the pump by its power cable!
Pumps should be stored in an upright position,
taking extreme care to protect the power cable and
control cables from crushing, nicks or tears which
would permit water intrusion.
Power cable ends must be protected from
immersion in water as well as moisture intrusion.
The cable will wick water into the pump if it is not
protected properly. Power cable leads should be
covered with shrink tubing or suitable sealing
material during storage.
Short Term Storage: Short term storage is
defined as any time less than six months. We
recommend that pump and accessories be
stored in its original shipping container in a
dry, temperature controlled area. If climate
controlled storage is not possible, all exposed parts
should be inspected before storage and all
surfaces that have the paint scratched, damaged
or worn should be re-coated with air dry enamel
paint. The pump should be stored in an upright
position.
Long Term Storage: Any storage time
exceeding six months is considered long term.
In addition to the safeguards specified above, the
impeller should be rotated once a month to prevent
the mechanical seals from being damaged, and the
pump should be inspected. The seal chamber oil
should be drained and replaced prior to
commissioning. The pump should be stored in an
upright position.